Stage Zero
Stage Zero is a partnership between the Environment Agency, the Evenlode Catchment Partnership, Thames Water and Blenheim, to recreate the impact that beavers would have on a floodplain.Stage Zero
Stage Zero is a partnership between the Environment Agency, the Evenlode Catchment Partnership, Thames Water and Blenheim, to recreate the impact that beavers would have on a floodplain.Stage Zero is a partnership between the Environment Agency, the Evenlode Catchment Partnership, Thames Water, and Blenheim, to recreate the impact that beavers would have on a floodplain. The project will allow the water to spill out of the River Dorn at high flow, naturally, to the surrounding water meadows. We now have a naturally working floodplain.
This project began in October 2021 and took three weeks to complete. It is the first time a project like this has been done in the United Kingdom in conjunction with tree planting. After the revolutionary river work is completed, it will be transformed from its current agricultural drained state, to much more of what rivers might have looked like in the past.
Diagram showing the floodplain work
The diagram below shows the true scale of the project. Three woody debris dams will be created which means water spills out of the river more regularly. This results in the river having lots of channels to move through which slows it down. The introduction of fallen wood on the floodplain wood (felled trees) will remove effects of historical agricultural drainage and a series of bank punches will allow water run off more regularly.
The Water Meadows
The water meadows are unique and provide a valuable habitat for birds, small mammals, and plants from small aquatic species to mature trees. We have been using computer modelling to survey the area and from the results, this is the most suited location for the works.
Water Quality
Previously we would have removed silt and put it along the banks, which means when a high flow event comes through, the water is constrained and therefore bypasses the filter and flows down into the Queen Pool. This reduces the water quality so it is our aim to intercept the water before it reaches the Pool.
The Project
This project is unique, and we have developed it alongside the Environment Agency, Thames Water and the Evenlode Catchment Partnership. Working collaboratively has allowed us to share learnings which creates better outcomes and a more sustainable, long-term solution.
We’re enhancing the natural processes of the landscape to treat the water in a natural way. When the water is slowed down it will mean the flood won’t be as severe.
The Actions
We will create an area of wetland habitat by blocking the man-made drain (previously used for agricultural grazing) at dipwell 1. This will increase the biodiversity of the area with the creation of new habitats, encouraging new species.
- Locking up sediment
- Cycling more nutrients
- Locking up more carbon
Newsletter sign-up
Stay up to date with our latest news, offers and events by entering your details here...